images

2.5 MW Solar Power Plant – Ultra Tech Cement at Surat Gujarat

The 2.5 MW Solar Power Plant installed for Ultra Tech Cement in Surat, Gujarat, stands as a significant step toward sustainable industrial energy solutions. Designed and executed with advanced solar technology, the project helps reduce dependency on conventional electricity while supporting clean and renewable power generation.

This industrial solar installation is engineered to deliver high performance, long-term reliability, and optimized energy output for large-scale manufacturing operations. By harnessing solar energy, the plant contributes to lowering operational energy costs and reducing carbon emissions, aligning with modern sustainability goals and green manufacturing practices.

 

Jangid Solar

Project Infomation

Client Name

Jaykumar Jangid

Plant Capacity

180 KW

Project Location

Anand, Gujarat

No. of Modules

455 WP

Project Time

26 Months

Project Type

Solutions for Power

Jangid Solar

Walk Through

Our team managed the project with a complete EPC approach, including detailed engineering, procurement of high-quality solar components, professional installation, testing, and commissioning. The system is built to withstand diverse environmental conditions while ensuring maximum efficiency and uninterrupted performance.

Jangid Solar

Complete Documentation for Your Solar Journey

Brochure Pdf

Related Document

Master Plan

Jangid Solar

Explore our office locations

Enquiry Now